Completed Projects

Since 2004, the company has been involved in the execution of numerous of construction projects and related services. During this period, it has successfully completed most of its projects, which has become a hallmark of its performance. Below is a list of these completed projects:

  • Execution of 100 housing units for the Savings and Real Estate Investment Bank in Benghazi.
  • Execution of 75 housing units for the Housing and Utilities Projects Authority in Jalu – Ajkharra Road.
  • Construction of a fully integrated model school for the Administrative Centers Development Authority in Sirte, covering 300 square meters in the 700 neighborhoods.
  • Construction of a fully integrated model school for the Administrative Centers Development Authority in Gaminis, covering 3,000 square meters.
  • Execution of 8 housing units for the Housing and Utilities Projects Authority in Tripoli – Hay Al-Battata.
  • Execution of 150 housing units for citizens who have obtained savings loans in Susa and its suburbs.
  • Execution of 80 housing units for citizens who have obtained savings loans in Al-Abyar and its suburbs.
  • Execution of 55 housing units for citizens who have obtained savings loans in Tokra and its suburbs.
  • Execution of 8 housing units for the Housing and Utilities Projects Authority in Tripoli – Hay Al-Battata.
  • Maintenance project for the control center in Tobruk, belonging to the General Electricity Company, on Umm Saad Road, with four floors.
  • Project for laying an optical fiber line for the General Electricity Company from the Zaytoun station to the control room in Foyhat, passing through the highway, with a length of 4.5 kilometers.
  • Execution of the North Benghazi alternative station project in Kuwifiya (11.30 kV) with trench connections.
  • Execution of the North Benghazi alternative station project in Kuwifiya (11.30 kV) with trench connections.
  • Project for constructing a fence around the Buhedima electricity station along the highway, with a length of 450 meters, and constructing an administrative building for the station.
  • Project for modifying existing stations and changing cable routes for the stations in Hawari, Sidi Abidah, and Sidi Hussein.
  • Execution of the Ajdabiya station project on Tobruk Road for the General Electricity Company, including external transformer bases, cable trenches, and a fuel tank.
  • Project for constructing aerial tower bases for Al-Madar Company along the oilfields route from Ajdabiya to Jalu.
  • Execution of many houses, villas, and commercial shops in Benghazi.
  • Construction of two fully integrated cultural centers for the Libyan Company in Qanfouda and Al-Wahishi in Benghazi.
  • Project for supplying and installing school furniture for four public schools in Benghazi and Tripoli.

Barga for construction and real estate investment co.

The company was established in 2004 with a networth of 2,100,000 LYD. The networth was amended in 2009 to 4,100,000 LYD, then raised in 2012 to 6,000,000 LYD, and in 2020 to 110 million Libyan dinars. The company is classified as a first-class company according to the classification of the ministry of public works in the state of Libya.